三峡水利枢纽地下厂房围岩关键块体稳定性分析
Stability analysis of key blocks surrounding underground plant of Three Gorges Project
-
摘要: 为分析三峡水利枢纽地下厂房围岩稳定性, 运用块体理论, 从右岸主厂房的断层及裂隙中筛选出主要结构面, 确定了该边墙上的4个关键块体, 通过蒙特卡罗方法对块体失稳概率进行分析。结果表明:不论在何种工况下, 1号、2号和4号块体失稳概率均接近或达到100%, 3号块体在地震工况下失稳概率达到63.75%, 地下厂房围岩稳定性差。为改善地下厂房稳定性, 提出3种调整工程布置的方案, 其中方案①可使2号块体消失, 3号、4号块体失稳概率为0, 1号块体体积大幅减小, 且地震工况下失稳概率降低至34.02%, 地下厂房围岩稳定性提高, 为优选方案。Abstract: To evaluate the stability of the surrounding rock of underground powerhouse in Three Gorges Water Conservancy Project, this paper applies block theory to screen out the main structural surfaces from the faults and fissures of the right bank main plant, identifies the four key blocks on the side wall, and analyzes the instability probability of the blocks by Monte Carlo method.The result shows that the destabilization probability of blocks 1, 2, 4 is close to or reaches 100% regardless of working conditions, and the destabilization probability of block 3 reaches 63.75% under seismic conditions, which indicates that the poor stability of the surrounding rock of the underground plant.In order to improve the stability of the underground plant, three engineering layout adjustment schemes were presented.Among them, option 1 can make two blocks disappear, the instability probability of blocks 3 and 4 is 0, and the volume of block 1 is greatly reduced, and the instability probability under seismic conditions drops to 34.02%.It enhances the stability of the surrounding rock of the underground powerhouse and regard as the preferred solution.
下载: